New Launches in Old Klang Road 2026: Prices & Full List

13 Old Klang Road, Seputeh, OUG and Taman Desa projects compared: from RM 339,000, building progress from KPKT and real NAPIC sale prices.

New Launches in Old Klang Road 2026: Prices & Full List

The short answer

Around Old Klang Road, Seputeh, OUG and Taman Desa there are 13 residential projects on this list, 10,553 homes in all. The cheapest starts at RM 339,000 (M Aurora) and the dearest at RM 3,919,800 (Aetas Seputeh), and eight of the 13 start below RM 700,000.

What the Housing Ministry's records add (TEDUH, updated 16 November 2026):

  • Three are finished, with a CCC: TRIA Seputeh (2023), The Maple Residences (2025) and Est8 @ Seputeh (2026).
  • One is sold out: Riverville Residences 2, all 660 units, at 96% building progress.
  • One is behind schedule: The Atas Residences is listed as "Lewat", with its blocks at about 33% to 38%.

The spread is wide. With a 90% loan at an assumed 4% over 35 years, M Aurora's starting price works out at about RM 1,351 a month and Aetas Seputeh's at about RM 15,620, with every other project in between. The same area serves a first-time buyer stretching for a RM 339,000 home and a family buying a 3,531 sq ft freehold apartment.

Buying from overseas? Seven of the 13 have units priced at RM1,000,000 or more; the foreign-buyer note under the main table names them. Want me to work it out for your own case? WhatsApp +60 17-279 8932.

Every project compared

Cheapest first. The price per square foot is what each developer quoted, rounded to RM 10. Distances to stations are measured as the crow flies. A finished building's starting price is the developer's launch price, which can differ from what its owners sell for now; the NAPIC section below shows the actual sale prices.

How to read it: at three budgets, the big table hides a real choice.

BudgetOption AOption BWhat the extra money buys
About RM 530,000 to RM 600,000Est8 @ Seputeh, RM 529,000: completed 2026, leasehold, about 260 m from Seputeh KTMGen Starz Residences, RM 593,000: freehold, expected 2028RM 64,000 more buys freehold, but you wait until 2028
About RM 670,000 to RM 770,000Aras Residences, RM 666,000: freehold, expected 2029, from 850 sq ftThe Maple Residences, RM 765,900: freehold, completed 2025, from 808 sq ftRM 99,900 more buys a finished home from the same developer
About RM 800,000 to RM 830,000One Seputeh, RM 799,365*: freehold, expected December 2029, from 657 sq ftThe Atas Residences, RM 825,000: leasehold, from 1,156 sq ft, listed as behind scheduleRM 25,635 more buys about 500 sq ft more space, with a delay risk

My view: if you want to move in or rent the unit out within a year, I would start with Est8 @ Seputeh or The Maple Residences, because both are already finished. If you will hold for many years and can wait, I would pay the extra for freehold at Gen Starz Residences. I would only take The Atas Residences for its space if a late handover does not hurt you.

Prices marked * are the lowest list price in the Housing Ministry's unit list for that project; the others are from the project database behind this site.

ProjectDeveloperFromPrice per sq ftSizesUnitsTenureCompletionNearest station
M AuroraMajor Land Development (Mah Sing)RM 339,000about RM 610556–1,019 sq ft1,544FreeholdExpected 2030Jalan Templer KTM (about 410 m)
Riverville Residences 2Alzac DevelopmentRM 430,000*—807–915 sq ft660FreeholdExpected October 2027Jalan Templer KTM (about 850 m)
Est8 @ SeputehTitian Sama (Eupe)RM 529,000about RM 820543–1,947 sq ft821LeaseholdCompleted 2026Seputeh KTM (about 260 m)
M AspiraMah Sing PropertiesRM 538,800about RM 760–800706–1,006 sq ft1,618LeaseholdExpected 2029Salak Selatan KTM (about 1.2 km)
Radium ArenaRadium GlobalRM 569,000*—658–920 sq ft988FreeholdExpected December 2028Petaling KTM (about 540 m)
Gen Starz ResidencesMajestic GenRM 593,000about RM 910650–874 sq ft360FreeholdExpected 2028Pantai Dalam KTM (about 570 m)
Lunar SeputehMRCB LandRM 607,800about RM 860–900683–1,646 sq ft483LeaseholdExpected 2030Angkasapuri KTM (about 560 m)
Aras ResidencesWCT OUG DevelopmentRM 666,000about RM 780850–1,062 sq ft1,272FreeholdExpected 2029Sri Petaling LRT (about 900 m)
TRIA SeputehMRCB Seputeh LandRM 736,800about RM 820764–4,575 sq ft734LeaseholdCompleted 2023Angkasapuri KTM (about 640 m)
The Maple ResidencesWCT OUG DevelopmentRM 765,900about RM 950808–1,378 sq ft940FreeholdCompleted 2025Sri Petaling LRT (about 730 m)
One SeputehSeputeh KukuhRM 799,365*—657–1,820 sq ft383FreeholdExpected December 2029Tun Sambanthan monorail (about 660 m)
The Atas ResidencesKaisar MaximRM 825,000about RM 7101,156–1,518 sq ft624LeaseholdExpected 2028Seputeh KTM (about 580 m)
Aetas SeputehArdent ResidenceRM 3,919,800*—3,531–14,869 sq ft126FreeholdExpected 2028Mid Valley KTM (about 730 m)

For the four projects marked *, the completion dates, sizes and tenure come from the advertisements the developers filed with, and had approved by, the Housing Ministry. The nine projects with a price per square foot range from about RM 610 (M Aurora) to about RM 950 (The Maple Residences), with a simple average of about RM 800.

Foreign buyers: under the federal guideline, a foreigner cannot buy a property priced below RM1,000,000. In practice that rules out most units here. Take Est8 @ Seputeh: its RM 529,000 entry unit is closed to a foreign buyer, who can only look at the bigger layouts, priced up to RM 1,946,400. TRIA Seputeh, One Seputeh, Lunar Seputeh, The Maple Residences and The Atas Residences work the same way. Aetas Seputeh is the only project where every unit, from RM 3,919,800, clears the line. An MM2H holder must meet whichever is higher: the MM2H minimum or that RM1,000,000 guideline.

Building progress and units sold (Housing Ministry, 16 November 2026)

The Housing Ministry's TEDUH system shows every licensed project's status, the progress of each block and, for most, which units are sold. This is the developer's own report to the ministry, not a sales brochure.

ProjectKPKT statusBuilding progressUnits sold
TRIA SeputehCompleted with CCC (12 May 2023)100%—
The Maple ResidencesCompleted with CCC (30 May 2025)100%652 of 940
Est8 @ SeputehCompleted with CCC (19 May 2026)100%812 of 821
Riverville Residences 2On trackAbout 96%660 of 660
Gen Starz ResidencesOn trackAbout 49%356 of 360
The Atas ResidencesBehind scheduleAbout 33% to 38%549 of 624
Radium ArenaOn trackAbout 34%624 of 988
Aras ResidencesOn trackAbout 22%97 of 1,272
M AspiraOn trackAbout 21% to 22%Not shown in the unit list
One SeputehOn trackAbout 21%62 of 383
Lunar SeputehOn trackAbout 6%9 of 483
Aetas SeputehOn trackAbout 36% to 40%125 of 126
M AuroraOn trackAbout 5%Not shown in the unit list

How to use it: a project that is 96% built and sold out (Riverville Residences 2) carries very different risk from one at 5% (M Aurora). For The Atas Residences, the "behind schedule" flag matters more than the expected year: under the standard Schedule H agreement the developer owes late delivery damages if vacant possession is not given within 36 months of your SPA, so ask the developer to show you the latest progress before you sign.

What completed homes nearby actually sold for (NAPIC)

NAPIC, the government's property data centre, publishes every recorded sale. Its data does not separate first sales from resales. Two completed projects on this list have enough records:

ProjectSales recordedPrice rangeMedian per sq ft
TRIA Seputeh37, January 2024 to November 2025RM 781,000 to RM 2,537,000About RM 1,000
The Maple Residences (registered as Residensi Mapel OUG)7, October 2025 to April 2026RM 640,000 to RM 1,127,000About RM 850

A 1,001 sq ft unit at TRIA Seputeh, for example, changed hands for between RM 906,000 and RM 1,110,000 in these records. That is the number to hold up against a new launch's price per square foot: it shows what buyers in the area have actually paid for a finished home, rather than what a brochure asks.

By budget, with the monthly instalment

Monthly instalment at the starting price, with a 90% loan at an assumed 4% a year over 35 years. The rate is an example, not a quote from any bank; see the loan calculator for your own numbers.

BudgetProjectFromMonthly instalment
Below RM 500,000M AuroraRM 339,000About RM 1,351
Riverville Residences 2 (sold out)RM 430,000About RM 1,714
RM 500,000 to RM 600,000Est8 @ SeputehRM 529,000About RM 2,108
M AspiraRM 538,800About RM 2,147
Radium ArenaRM 569,000About RM 2,267
Gen Starz ResidencesRM 593,000About RM 2,363
RM 600,000 to RM 800,000Lunar SeputehRM 607,800About RM 2,422
Aras ResidencesRM 666,000About RM 2,654
TRIA SeputehRM 736,800About RM 2,936
The Maple ResidencesRM 765,900About RM 3,052
One SeputehRM 799,365About RM 3,185
RM 800,000 to RM 1,000,000The Atas ResidencesRM 825,000About RM 3,288
Above RM 1,000,000Aetas SeputehRM 3,919,800About RM 15,620

What a step up buys: going from M Aurora (about RM 1,351 a month) to Est8 @ Seputeh (about RM 2,108) costs about RM 757 more a month. For that you get a finished home with a CCC, about 260 m from Seputeh KTM, instead of waiting for a building expected in 2030.

Maintenance fees (the nine database projects)

ProjectMaintenance fee per sq ftA 900 sq ft unit pays about
M AuroraRM 0.30, plus a 10% sinking fundRM 297 a month
M AspiraRM 0.36RM 324 a month
Gen Starz ResidencesRM 0.38, sinking fund includedRM 342 a month
Aras ResidencesRM 0.39, sinking fund includedRM 351 a month
The Maple ResidencesRM 0.39, sinking fund includedRM 351 a month
TRIA SeputehRM 0.40, sinking fund includedRM 360 a month
The Atas ResidencesEstimated RM 0.40, sinking fund includedRM 360 a month
Est8 @ SeputehRM 0.44, sinking fund includedRM 396 a month
Lunar SeputehRM 0.495, sinking fund includedRM 446 a month

On the same 900 sq ft, the gap between the highest and lowest is about RM 149 a month, about RM 1,788 a year. Add that to the starting price when you compare. The other four projects' fees are not in the database, so they are left out.

By completion

WhenProjectsWhat buying now means
CompletedTRIA Seputeh (2023), The Maple Residences (2025), Est8 @ Seputeh (2026)You can move in or rent it out straight away, and NAPIC shows what units sell for
Expected 2027Riverville Residences 2 (October 2027)Sold out, so only from an owner who bought earlier
Expected 2028Gen Starz Residences, Radium Arena (December 2028), Aetas Seputeh, The Atas Residences (behind schedule)About two years of progress payments; for The Atas, watch the ministry's flag
Expected 2029M Aspira, Aras Residences, One Seputeh (December 2029)About three years before the keys
Expected 2030M Aurora, Lunar SeputehThe longest wait; both are at about 5% to 6%

The waiting has a cost. Buy M Aurora now and you pay progress payments, and interest on the loan released so far, for about four years with no home to live in. Buy Est8 @ Seputeh or The Maple Residences and the keys come with the sale.

Near the train

Distances are straight lines, measured from each project's site. The area sits on the KTM Port Klang line (Angkasapuri, Pantai Dalam, Petaling, Jalan Templer) and the KTM Seremban line (Mid Valley, Seputeh, Salak Selatan); OUG is on the LRT Sri Petaling line, and One Seputeh is closest to the KL Monorail.

ProjectNearest stationAlso within 1 km
Est8 @ SeputehSeputeh KTM, about 260 mMid Valley KTM (about 360 m), Angkasapuri KTM (about 830 m)
M AuroraJalan Templer KTM, about 410 mPetaling KTM (about 520 m)
Radium ArenaPetaling KTM, about 540 mJalan Templer KTM (about 550 m)
Lunar SeputehAngkasapuri KTM, about 560 mSeputeh KTM (about 670 m)
Gen Starz ResidencesPantai Dalam KTM, about 570 m—
The Atas ResidencesSeputeh KTM, about 580 m—
TRIA SeputehAngkasapuri KTM, about 640 mSeputeh KTM (about 770 m)
One SeputehTun Sambanthan monorail, about 660 mKL Sentral monorail (about 730 m), KL Sentral (about 850 m)
The Maple ResidencesSri Petaling LRT, about 730 m—
Aetas SeputehMid Valley KTM, about 730 mBangsar LRT (about 880 m), Seputeh KTM (about 980 m)
Riverville Residences 2Jalan Templer KTM, about 850 m—
Aras ResidencesSri Petaling LRT, about 900 m—
M AspiraSalak Selatan KTM, about 1.2 km—

Pick by how you travel each day:

If your day looks like thisLook at firstWhy
You work in Mid Valley or ride the KTM Seremban line, and have no carEst8 @ SeputehSeputeh KTM is about 260 m away and Mid Valley KTM about 360 m: two stations on the same line
You pass through KL Sentral most daysOne SeputehThe only project here within 1 km of KL Sentral (about 850 m), with two monorail stations even closer
You take the LRT Sri Petaling lineThe Maple Residences or Aras ResidencesSri Petaling LRT is about 730 m and about 900 m away
You drive to work anywayM AspiraThe nearest station is about 1.2 km away, so buy it for other reasons, not the train

A straight line is always shorter than the walk. A highway, a fence or a missing footpath can turn 400 m into a 1 km walk, so walk the route once at the hour you would commute before you book a unit.

How to choose around Old Klang Road, Seputeh and OUG

Entry prices start low: M Aurora starts at RM 339,000 and eight of the 13 projects start below RM 700,000. Prices per square foot sit between about RM 610 and RM 950, so the real differences are completion risk, size and rail.

If you areLook first atWhy
A first-time buyer on a tight budgetM Aurora, Est8 @ SeputehLowest entry price; Est8 is finished and about 260 m from Seputeh KTM
A family wanting spaceThe Atas Residences, The Maple ResidencesEvery Atas unit is 1,156 to 1,518 sq ft; Maple is finished, with 3 to 4 bedrooms
Someone who wants to see the building firstTRIA Seputeh, The Maple Residences, Est8 @ SeputehAll three have a CCC, and NAPIC shows what units really sell for
A buyer of a large luxury homeAetas SeputehEvery unit is 4 to 5 bedrooms from 3,531 sq ft, freehold; 125 of 126 already sold
A buyer who is careful about delaysGen Starz Residences, Radium ArenaBoth on track; Gen Starz is about 49% built with 4 units left

Who should be careful: if you need the keys by a fixed date, I would not choose The Atas Residences until the ministry's flag changes, and M Aurora and Lunar Seputeh, at about 5% and 6%, are long waits. If you take the train every day, check the walk from your exact block: only Est8 @ Seputeh and M Aurora sit less than 500 m from a station.

For today's price list, the floor plans or a viewing of any of these 13, WhatsApp Shyan Yee (REN 46305, IQI Realty) at +60 17-279 8932.

Reviews and comparisons

This page compares the new projects. For the neighbourhoods themselves, see the Old Klang Road area guide and the Taman Desa and Old Klang Road area guide.

Frequently Asked Questions

How many new launches are there in Old Klang Road, Seputeh and OUG?

This guide covers 13 residential projects with 10,553 units between them. Five are on Old Klang Road (M Aurora, Gen Starz Residences, Lunar Seputeh, Radium Arena and Riverville Residences 2), four in Seputeh (TRIA Seputeh, Est8 @ Seputeh, One Seputeh and Aetas Seputeh), two in OUG (Aras Residences and The Maple Residences) and two in Taman Desa (M Aspira and The Atas Residences).

What is the cheapest new launch around Old Klang Road?

M Aurora, from RM 339,000, then Riverville Residences 2 from RM 430,000, which the Housing Ministry's unit list shows as fully sold. Est8 @ Seputeh from RM 529,000 is completed and has a CCC.

Which Old Klang Road projects are already completed?

TRIA Seputeh (CCC 12 May 2023), The Maple Residences (CCC 30 May 2025) and Est8 @ Seputeh (CCC 19 May 2026), according to the Housing Ministry's TEDUH records.

Is any project behind schedule?

As at 16 November 2026 the Housing Ministry's TEDUH system lists The Atas Residences as "Lewat", behind schedule, with its three blocks at about 33% to 38% progress. Every other project still under construction is listed as "Lancar", on track.

Which project is closest to the train?

Est8 @ Seputeh, about 260 m from Seputeh KTM as the crow flies, then M Aurora, about 410 m from Jalan Templer KTM. Ten of the 13 projects are nearest a KTM station; One Seputeh is nearest Tun Sambanthan monorail station (about 660 m) and the OUG projects are nearest Sri Petaling LRT.

What have completed homes in the area actually sold for?

NAPIC recorded 37 sales at TRIA Seputeh in 2024 and 2025, from RM 781,000 to RM 2,537,000, at a median of about RM 1,000 per sq ft. At The Maple Residences it recorded 7 sales from October 2025 to April 2026, from RM 640,000 to RM 1,127,000.

Can a foreigner buy around Old Klang Road?

Under the federal guideline a foreigner cannot buy a property priced below RM1,000,000, and most units here are below it. Every unit at Aetas Seputeh is above it, and six other projects list their larger layouts above it: Est8 @ Seputeh, TRIA Seputeh, One Seputeh, Lunar Seputeh, The Maple Residences and The Atas Residences. In Kuala Lumpur a foreign buyer also needs consent from the land authority.

What would the monthly instalment be on the cheapest projects?

With a 90% loan at an assumed 4% over 35 years, about RM 1,351 a month at M Aurora's RM 339,000 starting price and about RM 2,108 at Est8 @ Seputeh's RM 529,000. The rate is an example, not a bank quote.

Shyan Yee (Yee Woei Shyan), REN 46305

Written by

Shyan Yee (Yee Woei Shyan)

REN 46305 · IQI Realty Sdn Bhd · Kuala Lumpur

Licensed real estate negotiator focused on new launches in Kuala Lumpur, Selangor and Johor Bahru. Articles draw on developer material and site visits; prices and rules change, so confirm the latest before you buy.

Projects in this article

Related articles

Need Personalized Advice on Malaysian Real Estate?

Speak with licensed senior agent Shyan Yee (REN 46305) for MM2H property consultations, help with the consent from the land authority that foreign buyers need (the state authority outside KL), and a curated project shortlist.

WhatsApp Shyan Yee (+60 17-279 8932)